Severity: Warning
Message: fopen(/var/www/html/application/config/../sessions/ci_sessioned24317925d9740a6481333c1d418f92a24a308f): failed to open stream: No space left on device
Filename: drivers/Session_files_driver.php
Line Number: 156
Kathmandu, October 24: Chief Executive Officer of the National Reconstruction Authority Sushil Gyewali held a meeting with Nepal Army officials to discuss the status of the reconstruction of the army headquarters and other structures damaged in the earthquake.
Major General (technical) of the Nepal Army Yogendra Bahadur Khand informed that 96 percent work has been completed in reconstructing the army headquarters while reconstruction of Birendra Army Hospital, structures housing Sainik Prahari Battalion, Bhairab Nath Battalion and Ganesh Dal Battalion is currently on-going under the multi-year plan.
CEO Gyewali praised the army’s role in rescue, relief and rehabilitation after the April 2015 earthquake and said that the NRA was always positive towards the reconstruction of the army structures. “The NRA would continue to assist the Nepal Army in rebuilding its structures to be earthquake-resilient,” he said. Gyewali also requested the army delegation to complete the reconstruction in the given time frame and make the overall reconstruction activities transparent.
Severity: Warning
Message: rewind() expects parameter 1 to be resource, boolean given
Filename: drivers/Session_files_driver.php
Line Number: 188
Severity: Warning
Message: filesize(): stat failed for /var/www/html/application/config/../sessions/ci_sessioned24317925d9740a6481333c1d418f92a24a308f
Filename: drivers/Session_files_driver.php
Line Number: 192